News in perspective

Language

Back to section

Technical conditions issued in Ukraine for 5 GW of energy storage, with 650 MW implemented

Follow on Telegram

Technical conditions have been issued in Ukraine to connect energy storage systems (ESS) with a capacity of 5 GW, but only 650 MW has been implemented so far. This was reported by Yurii Ostapiuk, a representative of the National Energy and Utilities Regulatory Commission (NEURC).

According to Ostapiuk, other projects are on hold, in the development phase or addressing other issues. He described some of the issued technical conditions as “dormant.”

Reported by Інтерфакс-Україна.

The regulator’s representative cited these figures at the UKRAINE RENEWABLE ENERGY AGENDA 2027 conference, organized by the Ukrainian Renewable Energy Association. The event took place in Kyiv.

Follow our Ukrainian Telegram channel